HS installs new satellite tv…

that required immediate service!
less than 24hrs after our new satellite dish is installed,
a casuarina branch knocks it right out of service…the boys led by chef “manote M/K”, and dept head “wat E/N”,
come to the rescue, but it turns out that “thong L/N” the friendly Myanmar gardener ‘volunteers’ to climb up and cut down the branch… while everyone else waits on the ground…before “thong L/N”, starts to climb, for safety – the electrical mains are switched off,
and the heavy-duty generator comes (or SOUNDS) into play,
deafening the back service zones but providing power to our guest rooms
[flv:http://haadsonhappening.com/wp-content/uploads/2010/08/Haadsonhappening-blog100801-1.flv 320 240]
watch the whole event on video (with the Generator in the background)…
[flv:http://haadsonhappening.com/wp-content/uploads/2010/08/Haadsonhappening-blog100801-2.flv 320 240] [flv:http://haadsonhappening.com/wp-content/uploads/2010/08/Haadsonhappening-blog100801-3.flv 320 240] [flv:http://haadsonhappening.com/wp-content/uploads/2010/08/Haadsonhappening-blog100801-4.flv 320 240]
oh well, luckily the nose cone and the receiver still functions…Glossary:
E/N:Technical&Engineering
L/N:Gardening&Landscaping
M/K:Main Kitchen


Posted

in

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *