we add finishing touches to the yoga sala!
our Engineering Dept. build the base of the timber columns.
led by dept. head, mr.’wat E/N’, together with his assistant ‘a E/N’, and uncle ‘kham G/D’,
the trio complete the task before lunch.
uncle ‘kham G/D’ mixes the concrete as ‘a E/N’ bricks away!
then uncle ‘kham G/D’ enjoys the view!
glossary:
E/N:Technical&Engineering
G/D:Gardening&Landscaping
Leave a Reply